Monday, April 30, 2007
Tuesday, April 24, 2007
Beginning to take shape
Part of the reason that there will not be a full basement is the abundant slate evident with the excavation. These slate layers heave and shift with changes in the weather. To put in a complete basement floor, the entire slate bed would have to be removed and the material replaced with something more stable. This explains why portions of the old basement had bare slate floor with no moisture barrier instead of a poured floor.
The parking area has been built up more and smoothed. There will still be a downhill slope to the parking area. It will, however, be much less pronounced.
Wednesday, April 18, 2007
More footers, digging, concrete forms
I thought it prudent to get over to the site before it began raining. The crew was hard at work setting up the forms necessary to begin pouring concret walls. More seems to be dug out from the back and the parking area seems to be rising. Some more footers have been poured since yesterday. I find it very nice to drive by daily and finally see activity and changes in the scenery.
Tuesday, April 17, 2007
Where do they get those wonderful toys?
Today, they are hard at work taking advantage of this good weather. Forms for the walls are beginning to go up. In the back, they continue to dig out for the basement. The more they dig out the more they can use to grade up the parking area (At least that is my hope). For now, take in these pictures. There will be more to come.